Cairo Metro Line 4
LocationCairo, Egypt
EngineerNippon Koei
ClientThe National Authority for Tunnels (NAT)
Scope of work
Cairo Metro Line 4 includes a 12 Metro Stations starting from Hadaek AL Ashgar on 6th October City till El Mesaha Station at Al Haram Street with total length 13.70 km.
3 Stations will be Constructed by Hassan Allam Construction using the top-down construction method.
The scope will include all Civil Works, mechanical, electrical, plumbing, and architectural works.
Project facts
01
Project's total length is 13.70 km