2004
Damietta LNG
LocationDamietta, Egypt
EngineerHaliburton KBR, JGC Corporation and Tecnicas Reunidas JV. (epc)
ClientSpanish Egyptian Gas Company (SEGAS)
Scope of work
Project Description
The first and largest black sand minerals concentration and separation plants in Egypt and the Middle East.
Our Scope of Work includes supplying & construction of the MSP, PCP Plants along with the admin area in the design, supply, construction of Non-Process Infrastructure supply, installation of all works in civil and earthworks including piling and diaphragm walls, excavation off PCP main pond using dredgers, architectural works, Floating Study for the PCP.
Additionally, the supply, fabricate installing of the floating pontoons, concrete, structural works, mechanical and Piping works, Power and Electrical works.
Project facts
01
The output capacity of the plant is 5 million tons of LNG per year.
02