2023

Damietta Port New Western Breakwater

LocationDamietta, Egypt
ClientDamietta Port Authority

Scope of work

Project Description

Construction of a new western breakwater to protect the New-Damietta harbor and also to expand its ship capacity, the new western breakwater is about 3600ml. and consists of Core layer (rock size of 100 to 400 Km), First filtration layer (rock size of 200 to 400 Km), Protection and filter layers (rock size of 500 to 2000 Km), Armor Layer (rock size of 2500 to 3000 Km), tetrapod And precast concrete cube layer (size of 4.0 to 14.0 Ton).

The scope of work includes supply of crushed rocks “Dolomite” of 1,556,211 m3, rock size varies from 100 kg to 3000 kg each, concrete Tetrapod (4,6,10&14 Ton) size equals 35,364-unit, concrete Qty about 147,000 m3, Concrete cube (4&10 Ton) size of 15,519-unit, and concrete quantity is about 60,000 m3.

Project facts

01

Mobilization area

Mobilization area 360,000 m2.

02

Breakwater height

Breakwater height vary from 4.0 m up to 14.5 m from Bed level to Road level.

Related Projects