GOE Beni Sueif Cement Plant
LocationBeni Sueif, Egypt
EngineerChengdu Design & Research Institute of Building Materials Industry Co., Ltd (CDI). (epc)
ClientThe Government of Egypt.
Scope of work
Project Description
GOE cement plant is Largest worldwide, constructed in a duration of 6 months.
Our Scope includes the fully integrated civil and building works for 2 x 6000 tons/day Line, 130000 m3 reinforced concrete, 74000 m2 concrete paving, 15000 tons rebar, and 840 tons pre-stressing cables and110000 m2 Slip-form..
Project facts
01
74000 m2 concrete paving
02
130000 m3 reinforced concrete
03
2 x 6000 tons/day Line.