GOE Beni Sueif Cement Plant

LocationBeni Sueif, Egypt
EngineerChengdu Design & Research Institute of Building Materials Industry Co., Ltd (CDI). (epc)
ClientThe Government of Egypt.

Scope of work

Project Description

GOE cement plant is Largest worldwide, constructed in a duration of 6 months.

Our Scope includes the fully integrated civil and building works for 2 x 6000 tons/day Line, 130000 m3 reinforced concrete, 74000 m2 concrete paving, 15000 tons rebar, and 840 tons pre-stressing cables and110000 m2 Slip-form..

Project facts

01

74000 m2 concrete paving

02

130000 m3 reinforced concrete

03

2 x 6000 tons/day Line.

04

A fast-track project